Arrowstreet Attends the 2019 Preservation Achievement Awards

Arrowstreet will be attending the Boston Preservation Alliance’s 31st annual Preservation Achievement Awards on October 21st. We are extremely proud that Boston Volvo Village has received a 2019 Achievement Award! “It can be a challenge convincing large corporate entities trying to extol the forward-looking nature of their brand that a rehabilitated old building is actually just what they need. Yet…

/

Boston Volvo Village Opens in Allston, MA

Working in collaboration with The Ciccolo Group, the Arrowstreet team reimagined the original 72,000 square foot home of International Harvester Farm Equipment, an industrial building that was built in 1924, to create a mixed-use, two story development with office and cafe space as well as a showroom concept that represents the future for urban car dealerships on limited land. The…

/

Installing the Custom Soffit at Congress Square

At Congress Square, a 500,000 SF mixed-use project in downtown Boston, we pushed the lower two floors of the vertical addition back from the existing building’s exterior wall. This move created a physical space between the two structures, allowing the new addition to “float” above the existing building. This setback also created a significant overhang where we designed a custom Fiber…

/